REFERENCES
COMPLETION TEST ACTIVITIES
TASK: Full revision of railway vehicles and locomotives (completion test)
Repairs, comfort elevation, modernisation of 30-37 serie
CUSTOMER: MÁV-START Zrt., MÁV Személyszállítási Zrt., GYSEV
YEARLY CAPACITY: 400 vehicles/year
PRODUCTION OF PASSENGER RAILWAY CARS
TASK: Manufacturing different types of passenger coaches
CUSTOMER: Egyptian National Railways (ENR)
QUANTITY: 1350 passenger coaches
PRODUCTION OF HEAD BEAMS AND MAIN CROSSBARS
TASK: Production of head beams and main crossbars
CUSTOMER: Siemens Mobility GmbH Austria
QUANTITY: 608 pieces
PRODUCTION OF IC+ COACHES
TASK: Producing brand new IC+ type cars, designed and manufactured by us
CUSTOMER: The Hungarian state
QUANTITY: 92 passenger coaches
PRODUCTION OF PASSENGER COACHES
TASK:Production of new Z1 passenger coaches (1997–1998)
CUSTOMER: MÁV
QUANTITY: 50 passenger coaches
FINAL ASSEMBLY OF CAF TRAMS
TASK: Final assembly of 5-part CAF trams (2016–2021)
CUSTOMER: BKV
QUANTITY: 28 trams
ASSEMBLY OF DD TRAINS
TASK: Assembly of double decker intermediate cars for the Stadler KISS electric multiple units (2018–2020)
CUSTOMER: MÁV
QUANTITY: 11 trains
MODERNISATION
TASK: General overhaul and modernisation of Greek sleeping car
CUSTOMER: OSE Greece
QUANTITY: 42 cars
PRODUCTION OF NEW CARS
TASK: Production of new cars (2004–2005)
CUSTOMER: OSE Greece
QUANTITY: 79 cars
GENERAL OVERHAUL
TASK: General overhaul of Bheer ŽSR second-class open-floor cars (1995–1996)
CUSTOMER: ŽSR Szlovákia
QUANTITY: 52 cars
GENERAL OVERHAUL
TASK: General overhaul
CUSTOMER: CD Czech Republic, Ahee, Bhee, ČD open-floor cars (1995–1996)
QUANTITY: 100 cars
GENERAL OVERHAUL
TASK: General overhaul (2010–2013)
CUSTOMER: Norway
QUANTITY: 56 cars
PRODUCTION OF CAR BODY STRUCTURES
TASK: Production of car body structures (2007–2012)
CUSTOMER: SBB Switzerland
QUANTITY: 142 cars
RESTORATION OF THE RELIC-CARRYING CAR
TASK: Restoration of the reliquary car (2016–2020)
CUSTOMER: National Museum, Hungary
QUANTITY: 1 car
PRODUCTION OF RAIL DIAGNOSTIC DIESEL MEASURING TRAIN SET
TASK: Production of FMK 008 rail diagnostic train
CUSTOMER: MÁV Központi Felépítményvizsgáló Kft.
QUANTITY: 1 unit
REFURBISHMENT OF CAF TRAMS
TASK: Renovation of CAF trams
CUSTOMER: MÁV
QUANTITY: 47 trams
GENERAL OVERHAUL OF IC3 PASSENGER COACHES
TASK: General overhaul of IC3 passenger coaches
CUSTOMER: MÁV
QUANTITY: 10 coaches